Tiếng ViệtEnglish

Go Dau IZ

Go Dau is the only industrial park owning a complete internal port system with a capacity of up to 30,000 DWT that brings the advantage of exploiting transportation of goods by port and being near natural gas supply from Ba Ria - Vung Tau.

Location:
51 National route, Phuoc Thai Commune, Long Thanh District, Dong Nai
Type of project:
Industrial
Total area:
182,4 (ha)
Occupation rate:
100%

INTRODUCTION

 

Go Dau is the only industrial park owning a complete internal port system with a capacity of up to 30,000 DWT that brings the advantage of exploiting transportation of goods by port and being near natural gas supply from Ba Ria - Vung Tau.

With the strategic location, Go Dau Industrial park has developed as its initial orientation to be the strong industrialized development zone in the National Road 51, focusing on the projects of chemical industry, fuel.

Go Dau Industrial park has been invested in synchronized infrastructure including water supply system with capacity of 10.000 m3/day, wastewater treatment plant with capacity of 500 m3/day and ready equipped telecommunication services. After going into operation, Go Dau Industrial zone has quickly gained investors such as Shell, Total Gas, Samsung Chemical, LG Chemical, etc. and filled up 100% of its area.

LOCATION

  • Location: Phuoc Thai commune, Long Thanh District, Dong Nai Province
  • Total area: 182 ha
  • Occupancy rate: 100%

Road:

  • Distance to Bien Hoa city: 42 km
  • Distance to Ho Chi Minh city: 67 km

Port:

  • Distance to Go Dau port: 0.5 km
  • Distance to Phu My port : 11 km
  • Distance to Cai Mep port : 15 km
  • Distance to Cat Lai port : 39 km

Airport:

  • Distance to Tan Son Nhat airport: 60 km
  • Distance to Long Thanh airport : 12 km

TECHNICAL INFRASTRUCTURE

Water supply:

  • Supplied by Phu My Water Supply Company and Ho Cau Moi Water Supply Company.
  • Current applied price: detail at www.dowaco.vn.

Power supply:

  • Power supplier from national gridline.
  • Current applied price: detail at Decision No. 4495/QĐ-BCT dated 30/11/2017 regulated of electricity price of The Minister of Indutry and Trade.

Telecommunication system:

  • Complete technological corridor system for telecom services

Sewage system:

  • Capacity: 500 m3/day, biotechnology combined physiochemical..
  • The wastewater after treatment: applied the standard of QCVN 40:2011/BTNMT, Colume A.
  • Fee (exclusive of VAT) : 7.282 dong/m3 (» USD 0,32/m3).